Adopt Appropriation Ordinance Increasing Estimated Receipts and Appropriations in the Cantrell Sansom Roadway Widening Project from the Transportation Impact Fee Capital Legacy Fund in the amount of $455,900.33 and Adopt Appropriation Ordinance Increasing Estimated Receipts and Appropriations in the Cantrell Sansom Roadway Widening Project from the Transportation Impact Fee Capital Fund in the amount of $3,000,000.00 and Reduce the Fund Balance in the Service Area F Project in Both Funds by the Same Amounts (COUNCIL DISTRICT 2)


RECOMMENDATION:

It is recommended that the City Council:

  1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Cantrell Sansom Roadway Widening Project of the Transportation Impact Fee Capital Legacy Fund (39008) in the amount of $455,900.33, for the purpose of making transfer to the Transportation Impact Fee Capital Fund (30108), and reduce the fund balance in the Service Area F project (UN9916) by the same amount; and
     
  2. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Cantrell Sansom Roadway Widening Project from the Transportation Impact Fee Capital Fund (30108) in the amount of $3,000,000.00 from avaiable funds including transferred revenue, for the purpose of providing funding, at least in part, for the Cantrell Sansom Roadway widening project and reduce the fund balance in the Service Area F project (UN9916) by the same amount.
 
DISCUSSION:

Cantrell Sansom Road from Mark IV Parkway to IH-35W southbound frontage road is approximately 2,200 linear feet in length and identified in the City’s Master Thoroughfare Plan (MTP) as a four-lane divided neighborhood connector with sidewalks.  Preliminary cost estimates for roadway widening improvements are $4,200,000.00.  For this project, Cantrell Sansom Road is divided into two segments.  Segment One is a two-lane rural asphalt roadway from Mark IV Parkway to approximately 300 feet west of Old Denton Road.  Segment Two was a developer-funded infrastructure improvement associated with the Carlsbad Addition (City Project Number 100813).  Segment Two is a two-lane urban concrete roadway from approximately 300 west of Old Denton Road to the eastern property line of the Carlsbad development.  Segment Two requires additional right-of-way (ROW) for the northern half of the four-lane roadway and a short roadway extension of approximately 200 feet to connect into the future IH-35W southbound frontage road.  The project is located within Transportation Impact Fee Service Area F and is eligible for transportation impact fee funding.  Currently, $3,000,000.00 is available for design, right-of-way (ROW) and construction of these two segments.  Additional funding will be necessary to cover the remaining project construction costs, Texas Department of Transportation (TxDOT) and city staff costs and administrative charges.  Once the cost projections are solidified, staff intends to make a recommendation to use tax notes or other available cash to fund the remaining estimated cost of $745,000.00. This recommendation will be included in a future M&C that authorizes the associated contract with TxDOT. Meanwhile, this action earmarks existing funds for this purpose.

TxDOT approached the City of Fort Worth with a request for funds in the amount of $7,000,000.00 to participate in the $165,000,000.00 Mark IV Parkway interchange reconstruction and expansion project that includes constructing the IH-35W southbound frontage road to IH-820 and running westbound for connection to Mark IV Parkway.  The interchange improvements will modernize the Mark IV connection to IH-820 with the removal of the cloverleaf ramps. 

As TxDOT public involvement continued for the Mark IV Interchange project, requests were made to TxDOT for the connection of Cantrell Sansom Road to the future IH-35W southbound frontage road providing additional vehicle circulation in this area.  TxDOT then reached out to the City of Fort Worth staff to construct Cantrell Sansom Road making the connection to the future IH-35W southbound frontage road in lieu of the previous requested $7,000,000.00 for the Mark IV Interchange project.           

City staff recommends City Council support the use of transportation impact fee revenues in the amount of $3,000,000.00 for design, ROW acquisition and construction to widen Cantrell Sansom Road from Mark IV Parkway to IH-35W southbound frontage road.  Future M&Cs will be brought forward for Council’s consideration for the award of the design services contract, ROW acquisition, and award of the construction contract. 

This project is located in COUNCIL DISTRICT 2.

A Form 1295 is not required for this contract because:  This M&C does not request approval of a contract with a business entity.

 
FISCAL INFORMATION/CERTIFICATION:

The Director of Finance certifies that, upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Transportation Impact Fee Capital Fund.  Prior to an expenditure being incurred, the managing department has the responsibility to validate the availability of funds.

TO
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

FROM
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

Submitted for City Manager's Office by:
Susan Alanis (8180)
Originating Department Head:
Steve Cooke (5134)
Additional Information Contact:
Chad Edwards (7259)
David jodray (2891)

 
 
ATTACHMENTS
  20CANTRELL_SANSOM_RD_WIDENING_30108_AO19r.docx
  20CANTRELL_SANSOM_RD_WIDENING_39008_AO19r.docx
  M&C MAP Cantrell Sansom Rd Widening.pdf