COUNCIL ACTION:  Approved on 9/18/2018 

DATE: 9/18/2018 REFERENCE NO.: C-28856 LOG NAME: 20BONDS RANCH ROAD PHASE 2
CODE: C TYPE: NON-CONSENT PUBLIC HEARING: NO
SUBJECT:   Authorize Execution of a Contract with Jackson Construction, Ltd. in the Amount of $5,503,539.71 for Reconstruction of Bonds Ranch Road from the US 287 Northbound Frontage Road to the Re-aligned Shire Meadow Drive Roughly 1100 LF East of the Northbound Frontage Road (2018 Bond Funds) (COUNCIL DISTRICT 7)

RECOMMENDATION:

It is recommended that the City Council authorize the execution of a contract with Jackson Construction, Ltd. in the amount of $5,503,539.71 for the reconstruction of Bonds Ranch Road from the US 287 Northbound Frontage Road to the re-aligned Shire Meadow Drive roughly 1100 LF east of the Northbound Frontage Road. The roadway will be reconstructed from a 2-lane asphalt roadway to a 4-lane divided roadway with multi-lane roundabouts at the Northbound Frontage Road and Shire Meadow intersections (City Project No.101009).

 
DISCUSSION:

The project provides for the reconstruction of Bonds Ranch Road from the US 287 Northbound Frontage Road to the re-aligned Shire Meadow Drive roughly 1,100 LF east of the Northbound Frontage Road. The roadway will be reconstructed from a 2-lane asphalt roadway to a 4-lane concrete divided roadway with multi-lane roundabouts at the Northbound Frontage Road and Shire Meadow intersections

The project was advertised in the Fort Worth Star-Telegram on June 21, 2018 and June 28, 2018. Jackson Construction Ltd. submitted the only bid:

Proposal Opening: 7/19/2018  

Bid Results

Contractor

Base Bid

Alt. 1 Bid

Total Bid

Jackson Construction

$5,503,539.71

$93,987.00

$5,597,526.71

The project bid consists of a base bid and one alternate. The Base Bid included all elements necessary to construct the project. Bid Alternate 1 requested bid pricing for constructing an additional hooded left turn lane and driveway opening. Staff recommends awarding the contract to Jackson Construction Ltd., with the contract amount consisting only of the Base Bid. Analysis of the submitted bid was determined to be similar to other recently bid transportation projects.

Funds for this project are included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018).

Upon completion of this capital project, the anticipated annual operating impacts to the City of Fort Worth's budget are increased electricity costs for street lighting of approximately $1,227.44 and increased vegetation management of approximately $2,180.00.

Construction is anticipated to commence in October 2018 and be complete for final acceptance within 300 calendar days.

M/WBE OFFICE – Jackson Construction, Ltd. is in compliance with City's BDE Ordinance by committing to 3.00% MBE participation and documenting good faith effort.  Jackson Construction, Ltd. identified several subcontracting and supplier opportunities.  However, the firms contacted in the areas identified did not respond or did not submit the lowest bids. The City's MBE goal on this project is 25%.

This project is located in COUNCIL DISTRICT 7

 
FISCAL INFORMATION/CERTIFICATION:

The Director of Finance certifies that funds for this project are included in the 2018 Bond Program Fund. Prior to an expenditure being incurred, the participating department has the responsibility to validate the availability of funds.  

TO
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

FROM
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

Submitted for City Manager's Office by:
Susan Alanis (8180)
Originating Department Head:
Douglas Wiersig (7801)
Additional Information Contact:
Clint Hoover (6573)

 
 
ATTACHMENTS
  Form 1295 Jackson Construction.pdf
  Map Bonds Ranch.pdf