On February 9, 2010, Mayor and Council Communication (M&C C-24094) the City Council authorized an Engineering Agreement with Kimley-Horn and Associates, Inc., in the amount of $1,072,250.00 for the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements. The Agreement was subsequently revised by three amendments totaling $878,165.00 as follows: Amendment No. 1 in the amount of $46,995.00 administratively authorized on March 17, 2014, Amendment No. 2 in the amount of $261,070.00 authorized August 5, 2014 (M&C C-26903), and Amendment No. 3 in the amount of $570,100.00 authorized September 20, 2016 (M&C C-27934). Amendment No. 4 will provide for the necessary design to alleviate complaints of low water pressure from customers located in the western part of the Westside 2 Pressure Plane, south and east of the Western Hills North neighborhood to increase water pressure in the indicated areas. It is necessary to transfer a portion of the existing Westside 2 Pressure Plane to the adjacent Westside 3 Pressure Plane which has a higher operating pressure. The proposed pressure plane transfer and system improvements in the western part of the Westside 2 Pressure Plane will necessitate the installation of water mains and appurtenances on the following streets and easement:
Street | From | To | Elizabeth Lane | Cherry Lane | Reagan Drive | Ruby Place | Ramona Drive | Joyce Drive | Joyce Drive | Slocum Avenue | Arbor Avenue | Bangor Drive | Slade Boulevard | William Road | Arbor Avenue | Joyce Drive | Alta Mere Drive | Easement Between Calmont Avenue and Camp Bowie Boulevard | Alta Mere Drive | Lackland Road |
M/WBE OFFICE: Kimley-Horn and Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 20 percent M/WBE participation on this Amendment No. 4. In addition to the increased contract costs, $161,000.00 in additional funds are required for project management and real property acquisition costs associated with Amendment No. 4.
Engineering for the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements is one component of the overall project that includes project management, utility coordination, construction, material testing, inspection, and contingencies. The overall project budget is $12,042,580.00.
This project will have no impact on the Water Department's operating budget when complete.
The project is located in COUNCIL DISTRICT 3.
|