COUNCIL ACTION:  Approved on 12/13/2016 - Ordinance No. 22550-12-2016

DATE: 12/13/2016 REFERENCE NO.: **C-28047 LOG NAME: 60VCSSREHAB-SHIELD
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT:   Authorize Execution of an Engineering Agreement with Shield Engineering Group, PLLC in the Amount of $300,000.00 for Village Creek Sanitary Sewer Rehabilitation Improvements of Various Sanitary Sewer Mains Located Within the Carver Heights East, Ryanwood and South Edgewood Neighborhoods, Provide for Project Management, Real Property Acquisition, Utility Coordination and Material Testing and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 5 and 8)

RECOMMENDATION:

It is recommended that the City Council:

1.  Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $300,000.00 from available funds; and

2.  Authorize execution of an Engineering Agreement with Shield Engineering Group, PLLC in the amount of $300,000.00 for Village Creek Sanitary Sewer Rehabilitation with an option to renew up to two additional terms, (City Project No. 100275).

 
DISCUSSION:

This Mayor and Council Communication is to authorize the preparation of plans and specifications for replacements on Martin Street and Lake Arlington Road and various deteriorated sanitary sewer mains for Village Creek Sanitary Sewer Rehabilitation located on the following streets, alleys and easements and other locations within the Village Creek Drainage Basin as needed:

Street

From

To

Penland StreetE. 1st StreetConway Street
Conway Street 300 feet east of Penland StreetPenland Street
Sun Valley DriveMarie Jones RoadEast Loop 820 South
Durothy RoadMosson RoadSun Valley Drive
EasementEastland StreetBaylor Street
S Cravens RoadDowdell RoadWilkes Drive
Burton AvenueStalcup RoadCarverly Avenue
S Cravens RoadHart Street Fort Worth Avenue
Carverly AvenueBurton Avenue Richardson Street
Easement crossing East Loop 820 southTurner StreetEast Loop 820 South Northbound Frontage Road

Shield Engineering Group, PLLC proposes to perform the necessary design services for a lump sum fee of $300,000.00.  Staff considers this proposed fee to be fair and reasonable for the scope of services proposed.

In addition to the contract cost, $90,000.00 is required for project management, real property acquisition, utility coordination and material testing.

This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This Agreement may be renewed up to two additional terms at the City's option.

Engineering for the Village Creek Sanitary Sewer Rehabilitation improvement project is one component of the overall project that includes project management, easement, acquisition, utility coordination, material testing, inspection, construction and contingencies. The overall project budget is $3,597,608.00. This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Design is expected to start in September 2016 and be completed by March 2019. Construction is anticipated to commence in August 2018 and be completed by December 2020.

This project will have no impact on the Water Department's operating budget when completed.

M/WBE OFFICE - Shield Engineering Group, PLLC is in compliance with City's BDE Ordinance by committing to six percent SBE participation. The City's SBE goal on this project is six percent.  Additionally, Shield Engineering Group, PLLC is certified M/WBE firm.

The project is located in COUNCIL DISTRICTS 5 and 8, Mapsco 90J, 90Q and 90S.

 
FISCAL INFORMATION/CERTIFICATION:

The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance funds will be available in the current capital budget, as appropriated, of the Water Capital Projects Fund. The Fiscal Year 2017 Water and Sewer Operating Budget includes appropriations of $31,636,073.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects.  After this transfer for Fiscal Year 2017, the balance will be $25,883,728.00.

Appropriations for the Village Creek Sanitary Sewer Rehabilitation improvement project by Fund will consist of the following:
  

FUND

Current Appropriations

Proposed  Appropriations

Project Total*

Water Capital Fund 56002

$0.00

$390,000.00

$390,000.00

Project Total

$0.00

$390,000.00

$390,000.00

* Numbers rounded for presentation purposes.





TO
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

FROM
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

Submitted for City Manager's Office by:
Jay Chapa (5804)
Originating Department Head:
John Carman (8246)
Additional Information Contact:
Roberto C. Sauceda (2387)

 
 
ATTACHMENTS
  60VCSSREHAB CP SEWER CAP FUND 56002 AO17.docx
  60VCSSREHAB SHIELD Form 1295.pdf
  60VCSSREHAB SHIELD MAP 01.pdf
  60VCSSREHAB SHIELD MAP 02.pdf
  60VCSSREHAB SHIELD MAP 03.pdf
  60VCSSREHAB SHIELD MAP 04.pdf
  60VCSSREHAB SHIELD MAP 05.pdf
  60VCSSREHAB SHIELD MAP 06.pdf
  60VCSSREHAB SHIELD MAP 07.pdf