M&C Review


COUNCIL ACTION:  Approved on 12/13/2016 

DATE: 12/13/2016 REFERENCE NO.: **C-28035 LOG NAME: 20PARKER-HENDERSON AMEND 4
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT:   Authorize Execution of Amendment No. 4 in an Amount Not to Exceed $478,620.00 to City Secretary Contract No. 44165, an Engineering Services Agreement with Bridgefarmer & Associates, Inc., for the Design of Parker-Henderson Road from Mansfield Highway to Martin Street for a Revised Contract Amount Not to Exceed $1,083,064.85 (COUNCIL DISTRICT 5)

RECOMMENDATION:

It is recommended that the City Council authorize the execution of Amendment No. 4 in an amount not to exceed $478,620.00 to City Secretary Contract No. 44165, an Engineering Services Agreement with Bridgefarmer & Associates, Inc., for the design of Parker-Henderson Road from Mansfield Highway to Martin Street for a revised contract amount not to exceed $1,083,064.85 (CPN C01419).

 
DISCUSSION:

The 2008 Capital Improvement Program allocated funds for the reconstruction of Parker-Henderson Road from Mansfield Highway to David Strickland Road with the construction of sidewalks from David Strickland Road to Martin Street. An Engineering Services Agreement, City Secretary No. 44165 with Bridgefarmer & Associates, Inc. was authorized for the design of the project that included full concrete reconstruction of the roadway from Mansfield Highway to Prairie Dog Creek, a new Bridge at Prairie Dog Creek and sidewalks from the new bridge to Martin Street. Project costs to complete this project are estimated to substantially exceed the project funding allocation of $4.7 million. Staff has reevaluated the scope of the project and determined that modifications can occur that incorporate project elements that parallel the needs of the community and maintain the project budget within the funding allocation of $4.7 million.

The proposed design Amendment is to revise the project scope to include the following improvements:

  • Pulverization and overlay of the existing pavement from Mansfield Highway to Lifestyle Circle. This will reduce the quantity of new concrete pavement, but additional design effort is required to install drainage ditches, driveway culverts, or other storm drain improvements within the existing right-of-way;
  • Full reconstruction of the Parker-Henderson Road from Lifestyle Circle to David Strickland Road including sidewalks to link the abutting residential land uses to the elementary school and Prairie Dog Park;
  • Final design of box culverts to replace the existing bridge on Parker-Henderson Road over Prairie Dog Branch;
  • Construction of sidewalks on the west side of Parker-Henderson Road from David Strickland Road to Kellis Street. The previous project scope called for full reconstruction for this segment of Parker-Henderson Road, which is being eliminated. Additional design effort is required to install drainage ditches, driveway culverts, and storm drains within the existing right-of-way; and
  • Construction of sidewalks on the east side of Parker-Henderson Road from David Strickland Road to Willow Springs Road with drainage ditches in the existing right-of-way.

Funds for this Amendment will be provided from the 2008 Street Improvements Fund. Adjustments to current project appropriations will occur as part of the construction contract award such that remaining funds can be appropriated to other capital roadway needs.

The following Table summarizes previous contract action and Amendments.
  

-

Amount

Project Description

M&C Number

Approved

Initial Contract

$39,300.00

Conceptual Design of Parker Henderson Road from Mansfield Highway to Martin Street

N/A

2/13/2013

Amendment No. 1

$393,767.65

Final Design Plans

C-26422

1/26/2010

Amendment No. 2

$131,637.20

Subsurface Utility Investigations, Additional Geotechnical Investigations, ROW Surveys and Exhibits

C-26846

7/22/2014

Amendment No. 3

$39,740.00

Waterline Design Revisions

N/A

8/08/14

Amendment No. 4

$478,620.00

Revise Design as Noted Above

-

Pending

Contract Total

$1,083,064.85

-

-

-

M/WBE Office - Bridgefarmer & Associates, Inc. is in compliance with the City's BDE Ordinance by committing to an additional nine percent SBE participation on this Amendment No. 4. The City's SBE goal on this Amendment or extra work is nine percent.

This project is located in COUNCIL DISTRICT 5.
 
FISCAL INFORMATION/CERTIFICATION:

The Director of Finance certifies that funds are available in the 2008 Street Improvements Fund and the Water Improvements Fund.

  

Description

Existing Appropriations

Appropriations Per this M&C

Proposed  Appropriations

2008 Street Improvements Fund  (39407)

$ 7,817,807.28

$ 0.00

$ 7,817,807.28

Stormwater Capital Projects Fund (59651)

$ 199,428.10

$ 0.00

$ 199,428.10

Water Capital Projects Fund (59601)

$ 201,336.49

$ 0.00

$ 201,336.49

TO
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

FROM
    Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount

Submitted for City Manager's Office by:
Jay Chapa (5804)
Originating Department Head:
Douglas Wiersig (7801)
Additional Information Contact:
Mike Weiss  (8485)

 
 
ATTACHMENTS
  20Paker-Henderson Amend 4 Map 11-22-16.pdf
  Bridgefarmer Form 1295 Certificate CofFW.pdf